Re-Seals around Pavement Lights at Euston House, London.

  • Client Learning Tree International, Eversholt St, London, NW1 1AD

New Age Glass cut back 100mm of Asphalt to the front edges of 17nr Pavement Lights, dug down to where they meet the bearings, cleaned, torched dry and primed using Colas bitumous primer. After the primer was allowed to cure we hot poured Colas N2 Bitumen into the joints to provide a watertight seal. We covered all new seals with a sand & cement mix to protect them from the elements. All 18nr cross joints got the same treatment.   

Data Sheets & Drawings